Translate

31 July 2021

HTAR Field Hospital Ready For Use On August 4

Field Hospital that is being built at the Tengku Ampuan Rahimah Hospital (HTAR), in Klang

HTAR Field Hospital ready for use on Aug 4

BERNAMA
31/7/2021

SHAH ALAM, July 31 -- The Field Hospital that is being built at the Tengku Ampuan Rahimah Hospital (HTAR), in Klang, will be handed over to the hospital for use this Wednesday (Aug 4).

HTAR, through its Facebook, said the project is expected to achieve 40 per cent completion by tonight.

“The project is ahead of schedule by five per cent and will be handed over for use on Aug 4, it said.

Last July 8, Deputy Prime Minister Datuk Seri Ismail Sabri Yaakob announced that a field hospital will be built by the Malaysian Armed Forces at the Tengku Ampuan Rahimah Hospital (HTAR) in Klang to support preparedness of health services in Selangor and to help the Health Ministry deal with the current COVID-19 situation in the state.

Popular Posts - Last 7 days

Popular Posts - Last 30 days

Blog Archive

LIVE VISITOR TRAFFIC FEED

A visitor from California viewed 'PAC cadang LTAT tambah baik polisi dividen, pandua' 31 mins ago
A visitor from Kuala lumpur viewed 'Singapore has once again secure' 46 mins ago
A visitor from Johor bahru viewed 'Kereta Tunjuk Samseng Pukul Driver Bas | BEST FBKL' 1 hr 10 mins ago
A visitor from Batu caves viewed 'BEST FBKL' 1 hr 20 mins ago
A visitor from Ashburn viewed '25 terima rawatan awal setakat' 1 hr 21 mins ago
A visitor from Ashburn viewed 'Carro setuju sum' 1 hr 21 mins ago
A visitor from Kuala lumpur viewed 'Zarina Anjoulie tayang buah dada | BEST FBKL' 1 hr 23 mins ago
A visitor from Jeddah viewed 'Singapore has once again secure' 1 hr 29 mins ago
A visitor from Tulcea viewed 'Pengarah Syarikat 42 Tahun Ditipu RM5.5 Juta | BES' 1 hr 30 mins ago
A visitor from Ashburn viewed 'Mahkamah Korea Selatan pecat Presiden Yoon Suk Yeo' 1 hr 37 mins ago